Skip to search

Explore Lacey

Lacey, layer by layer.

Every place Living Lacey tracks, on one map. Click a marker for details and a link to its permanent page.

Popular
Leaflet Tiles Β© Esri β€” Source: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom

85 places shown Β· Marker positions are approximate.

Construction in progress

What's being built right now

Active work across Lacey β€” roads, utilities, civic projects, and new construction β€” pulled from permit records. Each card shows what it is, the application or permit behind it, and the estimated completion window.

Under ConstructionCommercial

Providence Expansion

4525 3rd Avenue SE, Lacey, WA 98503

A 2,834-square-foot expansion to the east side of the existing Providence Regional Cancer System medical facility. NOTE: this is a clinic expansion, not an addition to Providence St. Peter Hospital. The design adds storefront glazing, sunshades and articulated wall planes along the 3rd Avenue SE streetscape, with brick veneer, metal panels and glazing matching the surrounding medical campus.

Permit / application
City of Lacey Project #26-0057 (Site Plan Review, Woodland District, Commercial Design Review)
City of Lacey Project #26-0057 β€” Providence Expansion
Under ConstructionInfrastructure

Source 6 Grays Production Well

Lacey, WA

The third of the City of Lacey's new production wells, needed to perfect an existing water right for domestic and fire flow supply. Listed by city staff among the well and lift station projects under construction.

Estimated timeline
At least two of the three city wells expected to be complete in Q4 2026, possibly extending into early 2027 (city project update, April 2026).
Under ConstructionCommercial

Hogum Bay Town Center

Hogum Bay Road NE (residential component: 2463 Hogum Bay Rd NE), Lacey, WA

MASTER PLAN β€” not a single building. The Hogum Bay Town Center plan (City project #22-0188, binding site plan dividing two parcels into 8 lots) totals roughly 353,800 square feet: six commercial buildings at the west end and four mixed-use residential buildings at the east end, with courtyards, a community garden, play area, and pedestrian connections. Businesses open at the town center include 23 Kitchens and Super Chix; Cooper's Bar & Grill and Dough Zone were reported as upcoming tenants by The JOLT's City Council update. Approximately 350 market-rate apartments are planned; the residential component (Hogum Bay Apartments, 2463 Hogum Bay Rd NE) is now pre-leasing with first residents scheduled for September 2026.

Permit / application
City of Lacey Project #22-0188 β€” binding site plan, 8 lots
City of Lacey Project #22-0188 β€” Hogum Bay Town Center
Under ConstructionResidential

Williams Crossing

5216-5228 15th Avenue NE, Lacey, WA 98503

A large apartment community on the 5200 block of 15th Avenue NE (5216-5228 15th Ave NE, north of 15th & Century Court). The City application (#24-0060, filed April 2024) described 262 units in 12 three-story buildings; the site is now being developed by Sage Homes Northwest as The Elowen (formerly The Cypress Apartments), a 324-unit garden-style community with $67.62 million in construction financing (March 2025). Initial units are targeted to begin delivering in Q2 2026, with final delivery expected Q2 2027.

Permit / application
City of Lacey Project #24-0060; Ecology SEPA 202401533
City of Lacey Project #24-0060 β€” Williams Crossing
Under ConstructionResidential

Morel Meadows

8322 Steilacoom Rd SE, Lacey, WA 98513

A 179-home single-family community by D.R. Horton built on the former Ostrom's mushroom farm site at 8322 Steilacoom Road SE. Five floor plans, 3-5 bedrooms and 2.5-2.75 baths. Site plans identify an east pond, southwest pond, and a diesel-impacted plume area addressed in the environmental review.

Permit / application
City of Lacey PRD Subdivision #23-0180
Estimated timeline
Now selling; homes under construction
D.R. Horton β€” Morel Meadows
Under ConstructionResidential

Ventura Crossing

5124 Emery Ave NE, Lacey, WA 98516 (sales office)

A 68-lot D.R. Horton community in northeast Lacey combining paired and standalone single-family homes (1,392-2,535 sq ft, 3-5 bedrooms). A final plat for the 68-lot subdivision was filed with the City in February 2026.

Estimated timeline
Now selling; homes available and under construction
D.R. Horton β€” Ventura Crossing
Under ConstructionRetail

Meridian Market & Gas

8808 Campus Glen Drive NE, Lacey, WA

A new neighborhood convenience market and fueling station under construction near Willamette Drive NE and Campus Glen Drive NE in northeast Lacey, in the rapidly developing Hawks Prairie/Meridian Campus area. Current plans include approximately 4,000 sq. ft. of convenience market space, approximately 1,000 sq. ft. of second-floor office space, four fueling islands, and approximately 4,000 additional sq. ft. of commercial/retail space that could eventually house other businesses. The project adds another neighborhood retail option to northeast Lacey. It was identified in City of Lacey planning documents as "Meridian Market & Gas."

Permit / application
City of Lacey Land Use Project #20-0310
Estimated timeline
Under construction; groundbreaking underway as of 2026
City of Lacey β€” Project #20-0310: Meridian Market & Gas
Under ConstructionMixed Use

The Yard at College & 7th

College Street SE & 7th Avenue SE, Lacey, WA

A community-oriented development on roughly 1.6 acres in Lacey's Woodland District featuring a taproom, pickleball courts, a food truck pad, pedestrian areas, landscaping and open space. The City of Lacey announced construction has begun on The Yard, in the first phase of development. It could become a new entertainment and gathering destination in the Woodland District.

Permit / application
SEPA #202504680; City of Lacey Site Plan Review #25-0170 (Woodland District SPR decision, December 2025)
The Olympian β€” The Yard construction underway in Lacey; winter pause, spring resume (Oct 1, 2026)
Under ConstructionMixed Use

Homes on Martin

9106 Martin Way East, Lacey, WA

A five-story mixed-use building at 9106 Martin Way East with 96 dwelling units, approximately 7,500 square feet of ground-floor rentable retail space, a drive-through cafΓ©, office space, two levels of parking, EV charging, rooftop solar and a landscaped pedestrian area. Total project size is roughly 141,600 square feet. The City of Lacey carries it as the Martin Way Mixed Use project (#19-0205).

Permit / application
City of Lacey #19-0205 (Martin Way Mixed Use)
Thomas Architecture Studios β€” Homes on Martin project page
Under ConstructionResidential

The Enclave at Oak Tree

2402 Marvin Rd SE, Olympia/Lacey area, WA 98503

The Enclave at Oak Tree is a large new D.R. Horton residential community along Marvin Road SE near 22nd Ave SE, in the Lacey Urban Growth Area of Thurston County. The approved preliminary plat covers approximately 36.22 acres and 182 residential lots β€” 131 detached single-family homes and 51 attached, cluster-style townhomes β€” with approximately 12.63 acres of open space across nine tracts set aside for critical-area preservation, tree preservation, stormwater management, landscaping, and recreation. The site is split-zoned Low Density Residential and Moderate Density Residential, and Thurston County served as the SEPA lead agency. ## Status Construction activity is underway per Washington Department of Ecology records: the site holds an active Construction Stormwater General Permit (WAR313887), first effective September 17, 2024 and renewed effective January 1, 2026 through December 31, 2030. D.R. Horton is marketing single-family homes and townhomes in the community, with pricing listed as "to be determined." **A note on the home count:** official 2023 SEPA documents approved **182 residential lots** (131 detached homes + 51 townhomes). Current D.R. Horton marketing describes the community as approximately **181 homes**. Living Lacey reports the official plat number of 182 as the historical planning record and flags the 181 figure as builder marketing; if the final count differs, we'll update this page with a cited source. ## What we know - D.R. Horton (SSHI, LLC) is the developer/builder. - The project sits along Marvin Road SE near 22nd Ave SE at 2402 Marvin Rd SE. - The preliminary plat covers approximately 36.22 acres. - The 2023 SEPA proposal included 182 residential lots: 131 detached single-family homes and 51 attached, cluster-style townhomes. - Approximately 12.63 acres are designated open space across nine tracts. - The site is within the Lacey Urban Growth Area, split-zoned Low and Moderate Density Residential. - Ecology records show an active construction stormwater permit (WAR313887, effective 1/1/2026–12/31/2030). - D.R. Horton is currently marketing both single-family homes and townhomes here. - Current builder marketing references approximately 181 homes. ## What we don't know yet - Final starting prices and price ranges - Exact first-home release and model-home opening dates - Final completed home count, if different from the approved plat - Final single-family vs. townhome split - Construction phasing - HOA dues - Final amenities - Individual lot sizes - Full floor-plan lineup - Estimated project completion date ## Single-family homes D.R. Horton is marketing detached single-family homes within Enclave at Oak Tree. Verified details (plans, pricing, release dates) have not yet been published; check back or watch the updates below. ## Townhomes D.R. Horton is marketing attached, cluster-style townhomes within the community, consistent with the 51 townhome lots in the approved plat. Verified details have not yet been published. ## Floor plans & pricing No floor plans, square footages, or pricing have been officially released yet β€” listing syndication currently shows "price to be determined." When D.R. Horton publishes official plans or pricing, this section will be updated with the builder cited as the source. ## Amenities The approved plat dedicates approximately 12.63 acres of open space across nine tracts intended for critical-area preservation, tree preservation, stormwater management, landscaping, and recreation. Final resident amenities and HOA details have not been announced. ## Where this is The site is on Marvin Road SE near its intersection with 22nd Ave SE, in the corridor between Lacey and Olympia in northeast Thurston County. Marvin Road SE connects directly to Interstate 5 (Marvin Road interchange) and the Hawk's Prairie shopping area, with grocery, dining, and retail a few minutes north; the Lacey–Olympia area's main retail and employment corridors are a short drive away. Nearby Living Lacey-tracked projects include Ovation at Oak Tree (the adjacent 55+ Taylor Morrison community) and the Hawks Crest mixed-use project at 41st & Marvin. Schools and parks in the Marvin Road corridor are within the North Thurston Public Schools attendance area. ## Updates - **Oct 2026** β€” Created Living Lacey tracker record. Verified against Ecology SEPA records #202305689/#202205882, Thurston County File #2022105125, Ecology permit WAR313887 (active, 1/1/2026–12/31/2030), and current D.R. Horton marketing. Status: under construction / coming soon. (Verified Oct 2, 2026)

Permit / application
Thurston County File #2022105125; SEPA #202305689 (MDNS issued 12/01/2023, related record SEPA #202205882); Ecology Construction Stormwater General Permit WAR313887 (active version 2, effective 1/1/2026 through 12/31/2030). Applicant: SSHI, LLC dba DR Horton Inc., 11241 Slater Avenue NE, Suite 200, Kirkland, WA 98033.
Estimated timeline
Preliminary plat reviewed 2022–2023; MDNS issued December 1, 2023. Construction stormwater permit coverage effective September 17, 2024 and renewed January 1, 2026 through December 31, 2030. D.R. Horton marketing lists the community as "coming this spring" with pricing to be determined.
WA Dept. of Ecology SEPA Register #202305689 β€” Enclave at Oak Tree MDNS (Thurston County File #2022105125)
Under ConstructionResidential

Sleater Crossing

4038 23rd Ave NE, Olympia, WA 98506 (sales office)

D.R. Horton's 199-home community of single-family homes and paired townhomes on the Lacey–Olympia border, with direct access to the Chehalis Western Trail and a community park. More than 10 floor plans; homes from the $570s. Served by Pleasant Glade Elementary, Chinook Middle School, and North Thurston High School.

Estimated timeline
Now selling; homes available and under construction
Under ConstructionResidential

Summit Place

8400 Mullen Rd SE, Olympia, WA 98503

Rob Rice Homes' 56-home community off Mullen Rd SE, featuring luxury ramblers, two-story homes, and main-floor primary plans (1,856–2,692 sq ft) plus a private pickleball court, picnic area, and open space. Homes from the mid $600s. Served by Woodland Elementary, Nisqually Middle School, and Timberline High School.

Permit / application
Thurston County SEPA #201905802 (56-lot preliminary plat, 12.36 acres)
Estimated timeline
Now open; first homes completing October 2026
Under ConstructionResidential

Marvin Estates

8048 Pacific Ave SE, Lacey, WA 98503

DeTray's Family Enterprises' newest 55+ manufactured-home community: 103 sites under construction off Pacific Ave SE, about 0.7 miles from the Regional Athletic Complex and near walking trails and parks. Close to I-5, medical facilities, and Hawks Prairie shopping.

Estimated timeline
Development under construction; coming soon
Under ConstructionResidential

Aurora Oaks

5912 Stelain St SE, Olympia, WA 98513 (sales office)

Century Communities' community of five two-story floor plans (1,797–2,745 sq ft) southeast of Lacey, from $499,990, with quartz counters and premium stainless appliances. Near Long Lake Park, Capitol City Golf Club, and the Regional Athletic Complex.

Estimated timeline
Now selling; homes available and under construction
Under ConstructionResidential

Ovation at Oak Tree

3205 Bowthorpe Ct SE, Lacey, WA 98513

Taylor Morrison's Ovation 55+ active-lifestyle community in SE Lacey, featuring resort-inspired one-story home plans. Homes from the $590s.

Estimated timeline
Now selling; homes available and under construction
Under ConstructionResidential

Steilacoom Ridge

600 Steilacoom Dr SE, Lacey, WA 98513

Rob Rice Homes' Hawks Prairie community of ramblers, main-floor primary plans and two-story homes (1,856–2,736 sq ft), fully fenced and landscaped, with abundant open space and recreational areas. A few miles from the Regional Athletic Complex and minutes to I-5, Hawks Prairie shopping, and JBLM. Served by Meadows Elementary, Salish Middle School, and River Ridge High School.

Estimated timeline
Actively building and selling; multiple phases complete, new phases available
ApprovedCommercial

41st Ave

41st Ave, Lacey, WA

Site plan review and civil plan development located within the Hawks Prairie Planned Community area along 41st Avenue.

Permit / application
25-0261
Estimated timeline
Site plan approved July 8, 2026.
ApprovedCommercial

Veteran’s Services HUB-ADA Improvements Project

4232 6th Ave SE, Lacey, WA

Facility renovation and ADA accessibility improvements for the Lacey Veteran's Services HUB building.

Permit / application
25-0009
Estimated timeline
Timeline not specified.
ApprovedCommercial

Purcell Tire

Lacey, WA

Purcell Tire has received land use approval from the City of Lacey; the applicant is preparing construction documents.

Permit / application
#25-0155
ApprovedCommercial

Young Child & Family Center

Lacey, WA

Young Child & Family Center has received land use approval from the City of Lacey; the applicant is preparing construction documents.

Permit / application
#25-0099
ApprovedMultifamily

Canfield Apartments

Lacey, WA

Canfield Apartments has received land use approval from the City of Lacey; the applicant is preparing construction documents.

Permit / application
#24-0259
ApprovedHotel

Residence Inn by Marriott

2565 Marvin Road NE (Britton Plaza), Lacey, WA 98503

A 136-room Residence Inn by Marriott at Britton Plaza, approximately 115,655 gross square feet with 128 parking stalls. An earlier version of the project (#22-0081, Marriott Hotel at Britton Plaza) received an alteration approval; the current application was filed by Kalyan Lacey Hotel LLC.

Permit / application
City of Lacey Projects #24-0224 (Residence Inn by Marriott) and #22-0081 (Marriott Hotel at Britton Plaza); Ecology SEPA 202204552
City of Lacey Project #24-0224 β€” Residence Inn by Marriott
ApprovedMultifamily

Hicks Lake Apartments

Hicks Lake area, Lacey, WA

A 178-unit, three-building apartment complex on the west shore of Hicks Lake (4.98 acres), with two recreational structures, an in-ground pool and spa, sport court, picnic shelters, and shoreline access. One of two apartment projects planned along Hicks Lake β€” the companion is Gayteway at Hicks Lake (City project #20-190, 132 units).

Permit / application
City of Lacey Project #21-0081; Ecology SEPA 202201870
City of Lacey Project #21-0081 β€” Hicks Lake Apartments
ApprovedRoad

Hogum Bay Road

Hogum Bay corridor, Lacey, WA

Road project on the Hogum Bay corridor in north Lacey (#24-0350), approved and in the pre-construction phase. The corridor is one of the city's most active development areas, with the Hogum Bay Town Center under construction and hotel applications under review.

Permit / application
City of Lacey land use approval #24-0350 (BSP24-0002LA)
City of Lacey β€” Hogum Bay Road (#24-0350)
ApprovedMixed Use

41st & Marvin Mixed-Use (Hawks Crest)

NE corner of 41st Avenue NE and Marvin Road NE, Lacey, WA

A 213,000-square-foot mixed-use development at the northeast corner of 41st Avenue NE and Marvin Road NE, including 198 apartment units β€” six of them live/work units β€” plus 15,000 square feet of commercial space. The City issued a Mitigated Determination of Non-Significance on July 2, 2026 and Site Plan Review approval on July 8, 2026; the approval and MDNS have been appealed. Earlier public documents showed different residential unit counts; the 198-unit figure reflects the most recent City of Lacey documentation.

Permit / application
City of Lacey #25-0261; parcel 11935210200; MDNS 7/2/2026; SPR decision 7/8/2026
City of Lacey β€” #25-0261 41st Ave (Hawks Crest)
ApprovedHotel

Hogum Bay Hotels β€” Homewood Suites & Tru by Hilton

2315 Hogum Bay Road NE, Lacey, WA

Two hotels approved at 2315 Hogum Bay Road NE on a 4.18-acre site β€” one with 128 rooms and one with 98 rooms (City of Lacey project #24-0040, Site Plan Review and Preliminary Short Subdivision; MDNS issued October 2024). City development information has referenced three hotels totaling approximately 362 rooms in this broader Hogum Bay / Britton Place area of northeast Lacey; the third is tracked separately as the Residence Inn by Marriott. Room counts and locations are tracked per hotel and broader planning figures are not mixed into individual projects.

Permit / application
City of Lacey SPR #24-0040; MDNS-SEPA-24-0040 (Oct 2024); parcel 11811120800
City of Lacey β€” #24-0040 Hogum Bay Hotels and Commercial SPR
ApprovedRetail

The Landing at Hawks Prairie β€” Retail Expansion

1200 Galaxy Drive NE (Galaxy Dr & Martin Way), Lacey, WA

Additional commercial development at The Landing at Hawks Prairie: a Site Plan Review request to construct a shelled commercial retail building of approximately 4,000 square feet (City of Lacey #22-0043). The tenant for the shelled space has not been publicly confirmed.

Permit / application
City of Lacey SPR #22-0043
City of Lacey β€” #22-0043 The Landing at Hawks Prairie Retail Building

Help us improve the map

Are we missing something?

Tell us what belongs on the Living Lacey map. Every submission is reviewed and verified by hand β€” nothing is published automatically.